摘要 四川北川新县城体育中心为援助重建项目,工程所在地周边空旷无建筑物,地质条件复杂,土层为鱼塘和河道基础,以及拆除后尚未外运的建筑垃圾.原地貌高差较大,场区内均需回填,回填深度为2~9 m.根据工程实际条件,调整原来大开挖至持力层再分层回填的设计方案,改为利用当地河床多见的连砂石和粉土及破碎后的建筑垃圾混合料回填后强夯,以满足设计承载力的施工方案.强夯地基加固法缩短了工期,降低了工程造价,取得了良好的社会和经济效益. The Beichuan New County Sports Center in Sichuan Province is an aid reconstruction project.There is no building around the project site.But the geological conditions are more complex.The soil layer is the fish pond,river base and construction waste which has not been shipped out after demolition.The altitude difference of the original landform is large,so the whole field region needs backfill and the depths of the backfill are from two to nine meters.In order to accomplish the construction scheme design,the original design scheme of the heavy excavation to bearing stratum and then layered backfill is adjusted to using dynamic compaction after the mixture of the local river sand,silt and crushed construction waste material is backfilled according to the actual conditions.The results of the tests show that the dynamic compaction shortens the construction period,reduces the project cost and achieves good social and economic benefits.
出处 《青岛理工大学学报》 CAS 2011年第1期112-115,共4页 Journal of Qingdao University of Technology
关键词 大开挖 强夯 地基承载力 工期 heavy excavation dynamic compaction bearing capacity of foundation construction period
  • 相关文献

参考文献7

二级参考文献6

共引文献199

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部