CTCS-3级列控系统的调试与试验 被引量:3

Debugging and Dynamic Test of CTCS-3 Level Train Control System
下载PDF
导出
摘要 列控系统的调试和动态联调联试是高速铁路开通运营前的关键环节,通过测试,可实现对列控系统整体功能、接口关系和工程数据的检查、完善与优化。按照CTCS-3级列车运行控制系统开发周期,列控系统调试与试验划分为实验室仿真测试、现场设备静态调试、系统集成测试与联调联试等不同阶段,各阶段的主要测试内容、测试方法和要求不同,但又构成一个不可分割的有机整体。 The debugging and dynamic integration test and commissioning of train control system are the key process before the operation of a high-speed railway line.Through dynamic integration test and commissioning,the overall functionalities,the relationship of interfaces as well as the examination,perfection and optimization of engineering data of the CTCS can be achieved.According to the development cycle of CTCS-3 Level ATC,the process of debugging and test could be divided into four phases,including simulation test in lab,static equipment commissioning on the spot,integration test,and systematic test and commissioning.Each phase has different major contents,methods,and requirements of testing,and is one indispensable part of the whole testing.
出处 《铁道通信信号》 2011年第2期10-13,共4页 Railway Signalling & Communication
关键词 CTCS-3级列控系统 调试 试验 CTCS-3 Leve Train Control System Commissioning Test
  • 相关文献

参考文献1

二级参考文献3

  • 1张曙光.CTCS-3级列控系统总体技术方案[M].北京:中国铁道出版社,2009.
  • 2铁道部.CTCS-3级列控系统系统需求规范(SRS),科技运[2008]127号,2008,9.
  • 3铁道部.CTCS-3级列控系统综合试验试验大纲,铁技委函[2009]773号,2009,7.

共引文献12

同被引文献16

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部