摘要
介绍了广州歌剧院室外平台、栏板、飘带与"地下空间"连接部位的饰面清水混凝土施工过程,从模板体系及排版的设计、钢筋制作安装、混凝土的配制及浇筑、细部处理、涂层施工五大方面的质量控制进行阐述。
Introduction of Guangzhou Opera House outdoor platform,rail board,floating strip and "underground space" connection parts fair-faced concrete construction process.From the quality control of formwork system and layout design,steel bar fabrication and installation,concrete preparation and pouring,as well as detail treatment and coating to describe.
出处
《中国建材科技》
2011年第1期80-84,共5页
China Building Materials Science & Technology
关键词
饰面清水混凝土
模板
钢筋混凝土
fair-faced concrete
formwork
steel bar and concrete