摘要
在对平板电脑生产线进行全面调查的基础上,采用AHP法通过2项评价因素和6项评价因子对其生产线方案选择进行了综合评价。结果表明:平板电脑生产线评价因素层中,经济效益是评价中最重要的因素,应着重考虑影响经济效益的相关因素,以提高生产线的效率。
On the basis of a full-scale investigation of tablet computer production line,AHP method by two evaluation factors and six evaluation factors had been applied to comprehensively evaluate the production line.Results showed that: in the evaluation factors of tablet computer production line,the economic benefit is the most important factor,so the related factors of economic benefit should be taken into account in order to improve production efficiency.
出处
《物流科技》
2011年第3期127-129,共3页
Logistics Sci-Tech
关键词
层次分析法
生产线
平板电脑
analytic hierarchy process
production line
tablet computer