摘要
本文介绍了哈锅首台自主型300MW循环流化床锅炉的技术特点,并着重介绍了机组在168期间的运行情况,通过运行数据与设计数据的对比可知,锅炉的设计是成功的。
The characteristic of first self-developed 300mw CFB boiler by HBC is introduced in this article,especially about the unit operation condition in 168h try-run.Compare the design parameter with operating parameter,we know the boiler design is successful.
出处
《锅炉制造》
2011年第2期3-5,共3页
Boiler Manufacturing