摘要
舰船电力系统(shipboard power system,SPS)的网络重构是故障发生时,恢复系统供电、提高舰船生命力的重要途径之一。提出一种多代理系统(multi-Agent system,MAS)模型来实现舰船电力系统的重构,在保障高优先级负荷供电的前提下尽可能地恢复系统供电。所提出的MAS中,各代理都具备一定的推理能力,能够根据不同的环境做出合理的决策。采用Java程序设计语言和多代理软件开发框架(Java Agent development framework,JADE)设计MAS。通过舰船的典型故障算例验证所提出MAS模型的可行性和有效性。
The electric power network reconfiguration of shipboard power system (SPS) is one of the most important methods to restore power supply and improve survivability of shipboards. A prototype of a multi-Agent system (MAS) was proposed to reconfigure the SPS in order to maximize the number of served loads with highest priority. Agents of the MAS had the ability of illation, and made reasonable decisions according to different environment. The MAS was implemented using Java programming language and Java Agent development framework (JADE). The simulation results of typical SPS fault restoration cases demonstrated the feasibility and the advantages of the proposed MAS.
出处
《中国电机工程学报》
EI
CSCD
北大核心
2011年第10期81-87,共7页
Proceedings of the CSEE
关键词
舰船电力系统
代理
多代理系统
网络重构
shipboard power system
Agent
multi-Agent system (MAS)
network reconfiguration