BOT公路排他性条件对定价及社会效益影响研究 被引量:15

Research on effect of exclusive condition on pricing and social welfare of road under BOT scheme
下载PDF
导出
摘要 分析了私营财团和政府在BOT(build-operate-transfer)高等级公路的建设运营中的完全信息动态博弈过程,研究了公路建设中的排他性条件和出行者的不同时间价值这两个因素对道路定价和社会效益的影响问题.研究表明:私营财团在追求自身收益最大化目标下的收费价格决策,同时能够带来正的社会效益.而且,理论分析的结果证实排他性条件会随着高收入类出行者数量的不同而对私营财团收费价格以及社会效益产生不同影响,因此在政府授予特许权时应慎重考虑排他性条件的承诺. This paper analyzes the complete information dynamic game between the private consortium and government in BOT(build-operate-transfer) highway construction and operation,and studies the impacts of exclusive conditions and different time values of travelers on road pricing and social welfare in construction of highway.Research results indicate that the toll road can bring benefits to society when the private company is in pursuit of maximizing his own profit.And the results of theoretical analysis show that the influence of the exclusive conditions on the price of the toll road and social welfare varies with the number of high income travelers,so the government should award the concessions with discretion.
出处 《系统工程学报》 CSCD 北大核心 2011年第1期68-73,共6页 Journal of Systems Engineering
基金 国家自然科学基金资助项目(70772057)
关键词 BOT 收费公路 定价 排他性条件 社会效益 BOT toll road pricing exclusive condition social welfare
  • 相关文献

参考文献13

  • 1Henk G. Privatization and the public-private partnership[J]. Journal of Management Engineer, 1998, 14(4): 28-29.
  • 2Mills G. Welfare and profit divergence for a tolled link in a road network[J]. Journal of Transport Economics and Policy, 1995, 29(2): 137-146.
  • 3杨宏伟,周晶,何建敏.在BOT模式下收费道路的收益和社会效益研究[J].管理工程学报,2004,18(1):27-30. 被引量:15
  • 4赵立力,卜祥智,谭德庆.基础设施BOT项目中的两种政府保证研究[J].系统工程学报,2009,24(2):190-197. 被引量:14
  • 5周晶,陈星光,杨宏伟.BOT模式下的收费道路价格控制机制[J].系统工程理论与实践,2008,28(2):148-152. 被引量:15
  • 6Richard A, Marvin K. Financing capacity in the bottleneck model[J]. Journal of Urban Economics, 1995, 38(3): 272-290.
  • 7Yang H, Meng Q. Highway pricing and capacity choice in a road network under a build-operate-transfer scheme[J]. Transportation Research, 2000, 34(3): 207-222.
  • 8Liu L N, McDonald J F. Economic efficiency of second-best congestion pricing schemes in urban highway systems [J]. Transportation Research, 1999, 33(3): 157-188.
  • 9Chen A, Subprasom K. Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty[J]. Transportation Research, 2007, 41(6): 537-558.
  • 10Evans A W. Road congestion pricing: When is it a good policy[J]. Journal of Transport Economics and Policy, 1992, 26(3): 213-243.

二级参考文献45

  • 1邹国勇.BOT中的政府保证问题探析[J].对外经贸实务,2004(8):32-34. 被引量:13
  • 2贾涛,徐渝,陈金亮.库存量影响需求的供应链合同[J].西安工程科技学院学报,2005,19(2):143-147. 被引量:10
  • 3Nisangul C. Private Participation in Infrastructure : A Risk Analysis of Long-term Contracts in Power Sector[ D ]. Fairfax Virginia, U. S. A: George Mason University, 2002.
  • 4Tiong R L K. Risks and guarantees in BOT tender[J]. Journal of Construction Engineering and Management, 1995, 121 (2) : 183-188.
  • 5Ho S P. Real Options and Game Theoretic Valuation, Financing and Tendering for Investments on Build-Operate-Transfer Projects[D], Urbana-Champaign, U. S. A. : University of Illinois, 2001.
  • 6Francesca C. Putting BOT on the road[J]. Euromoney, 1989, (4) : 88-91.
  • 7Min C L. Contract Design of Private Infrastructure Concessions [ D ]. Berkeley, U. S. A. : University of California, 2000.
  • 8Tam C M. Build-operate-transfer model for infrastructure developments in Asia: Reasons for successes and failures[J]. International Journal of Project Management, 1999, 17(6) : 377-382.
  • 9Wang S Q, Tiong L K. Case study of government initiatives for PRC' s BOT power plant project[ J]. International Journal of Project Management, 2000 , 18 (1) : 69-78.
  • 10Kumaraswamy, M M , Zhang X Q. Governmental role in BOT-led infrastructure development[ J ]. International Journal of Project Management, 2001, 19(4) : 195-205.

共引文献57

同被引文献205

引证文献15

二级引证文献290

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部