期刊文献+

长江中游螺山站水位流量关系分析 被引量:18

Analysis on water level-discharge relation of Luoshan hydrologic station in middle reaches of Yangtze River
下载PDF
导出
摘要 螺山水文站是长江中游河段的重要控制测站,通过分析不同因素影响下螺山水文站水位流量关系及其变化规律,得出了螺山站水位流量关系多年基本稳定的原因。计算了螺山水文站在裁弯前后因河床淤积导致水位流量关系抬高的程度。为消除洪水涨落率、变动回水和断面冲淤的综合影响,提出了螺山站不同水位级下的水位流量关系,对于洪水期水文预报以及超额洪量分配与调度,具有重要的参考价值。 By analyzing the water level-discharge relation and variation rules at this station impacted by different factors,we draw a conclusion that the relation is basically stable over the past years.We calculate the uprising degree of water level-discharge induced by sediment deposition before and after the river bend cut-off at Luoshan hydrologic station.Aiming at eliminating comprehensive impacts of flood fluctuation ratio,fluctuating backwater and section erosion and deposition,we propose the water level-discharge relation at different water levels respectively.The results show that it has the important reference values for hydrological forecasting during the flood period and distribution and regulation of extra flood volume.
出处 《人民长江》 北大核心 2011年第6期87-89,共3页 Yangtze River
关键词 水位流量关系曲线 冲淤变化 水文分析 长江中游螺山站 water level-discharge relation curve variation of erosion and deposition hydrological analysis Luoshan hydrologic station at middle Yangtze River
  • 相关文献

参考文献1

  • 1水利部长江水利委员会水文局.1998年长江洪水及水文监测预报[M].北京:中国水利水电出版社,2000,9..

共引文献5

同被引文献158

引证文献18

二级引证文献90

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部