介绍步长加速法处理问题的基本步骤,以变电站最优选址为例,通过步长加速法在电网规划优化设计中的应用,说明了步长加速法具有较好的实用性。
Abstract:This paper introduces the basic process of step acceleration method, taking selecting location of transformer substation as an example, illustrates the method with better practical applications through application of this method in optimization design in electric network programming.
出处
《河北电力技术》
2011年第1期52-54,共3页
Hebei Electric Power
关键词
电网规划
优化设计
步长加速法
electric network programming
optimization design