摘要 我国以燃煤发电为主的现状在短期内还难以改变,控制SO2排放是社会和经济可持续发展的迫切要求。介绍了江西景德镇发电厂"上大压小"扩建工程2×660MW超超临界燃煤机组石灰石-石膏湿法脱硫系统取消烟气旁路的设计及#1机组运行情况,为同类工程推广应用湿法FGD无旁路烟道技术提供参考。 The status of coal-fired generation in China is difficult to change in the short term,control sulfur dioxide emissions is the urgent requirement of the social and economic sustainable development.In this paper,no bypass design of ultra-supercritical 2×660 MW coal-fired units of a limestone gypsum wet flue gas desulfurization system was in troduced,the coal-fired units is the expansion project of "replacing small power plants with large ones" of the Jiangxi Jingdezhen power plant,and operation of unit #1 was recommended in order to supply reference to similar projects,which apply wet flue gas desulfurization technology without bypass.
出处 《能源研究与管理》 2011年第1期1-4,8,共5页 Energy Research and Management
关键词 湿法脱硫系统 旁路烟道 设计 运行 wet desulfurization system bypass flue design operation
  • 相关文献

参考文献6

二级参考文献18

共引文献70

同被引文献16

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部