强化管理 坚定信心 把“长治”工程全面推向21世纪

Push Forward the Overall “Yangtze River Harness" Project to 21st Century Through Improving Management and Strengthening Confidence
下载PDF
导出
摘要 长江上中游水土保持重点防治工程建设涉及9 省( 市) 183 个县, 10 年来共投入资金12 亿元,投工13 亿工日, 完成土石方14 亿m3 , 累计治理水土流失面积58 万km2 , 有效改善了生态环境和农业生产条件。治理区林草覆盖率提高了19 % , 人均基本农田达0067 hm2 , 人均产粮达450 kg , 有800多万人口摆脱了贫困。由于科学规划、严格管理, 树立了国家重点工程的良好形象。 Soil and Water conservation focal harness project in the upper and middle Yangtze River covers 183 counties in 9 provinces with total investment of 1.2 billion Yuan in the past 10 years,input of 1.3 billion labor day and 1.4 billion cubic meters of earth and stonework, which leads to accumulative area of 58 000 km 2 of soil and water loss under control and effective improvement of local ecological environment and agricultural production conditions. Forest coverage in the harnessing area is increased by 19%, basic farmland for each farmer reaches 0.067 hm 2, grain production per capital is 450 kg, and 8 million people get free from poverty. A good model of national key project has been set through scientific planning and strict management.
作者 陈俊府
出处 《中国水土保持》 1999年第9期1-3,共3页 Soil and Water Conservation in China
关键词 水土保持 重点防治工程 管理 长江上中游 the upper and middle Yangtze River soil and water conservation Key harnessing project 10 years effect development management
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部