摘要
施工控制网点的选埋是影响建设场地顺利开展和后续工程有效衔接的关键点。本文通过工程实例,详尽地介绍了在当前建设场地普遍存着边设计边施工的情况下,电力行业建设场地中的施工控制网点的选埋方法及实际应用。
The election and burying of construction control nodes is a crucial step which affect the development of the building land and effective interface on the following projects beneficial to the smooth development of the key points of convergence.Through the engineering example,and in the case of the design and construction at the same time on building land,this paper introduced a selected and buried method on construction control network nodes of the electricity sector building land and its application.
出处
《现代测绘》
2010年第6期40-42,共3页
Modern Surveying and Mapping
关键词
施工
控制点
选埋
保护
construction
control nodes
selected and buried
protection