摘要
本文对大型斜拉桥主塔基础钢围堰的下沉定位测量作了全面论述,包括大型双壁钢围堰的拼装接高、基准面传递、吸泥下沉、纠偏定位。旨在为大型斜拉桥建设提供可行的围堰监测分析方法,指导主塔基础的围堰施工。
This paper deals with the settlement position monitoring of steel cofferdam of main tower foundation for a large suspended bridge, which is aimed at providing an effective monitoring method for such kind of cofferdam construction.
出处
《工程勘察》
CSCD
北大核心
1999年第5期47-49,共3页
Geotechnical Investigation & Surveying