摘要 为研究火灾下植筋试件极限承载力与受火时间的关系,进行了火灾下4个植筋试件拉拔试验.采用自制试验炉对植筋试件受火升温,当到达设定时间后,进行拉拔试验,试验中记录植筋试件的拉拔力,植筋末端位移及受火时间.试验结果表明:在受火时间不超过30 min时,15d和20d(d为钢筋直径)植筋试件的极限承载力降低程度不同,但当受火时间大于45 min后,两者的极限承载力相差不大.当受火时间超过60 min后,两种不同植筋深度植筋试件的极限承载力下降约85%.15d植筋试件和20d植筋试件分别在受火时间不超过15 min和30 min时可以保证钢筋屈服. To study the relationship between ultimate strength of post-installed rebar and fire duration,4 specimens in fire were designed and tested.The test procedure included specimen installation,heating by oil burner and testing when the heating time reached to the fixed time.Records had been made on the temperature,the ultimate strength,the rebar displacement and the heating time.The test results show that when the fire duration is less than 30 min,the ultimate strength of 15d have great difference from that of 20d.While the fire duration is more than 45 min,the ultimate strengths of 15d and 20d have little difference from each other.When the fire duration is more than 60 min,the ultimate strength at high temperature decreases about 85% of that at ambient temperature.The post-installed rebar can yield when the fire duration for 15d or 20d specimen is less than 15 min or 30 min,respectively.
出处 《哈尔滨工业大学学报》 EI CAS CSCD 北大核心 2010年第12期1958-1961,共4页 Journal of Harbin Institute of Technology
基金 国家自然科学基金资助项目(50778134)
关键词 植筋 火灾 受火时间 极限承载力 post-installed bar fire fire duration ultimate strength
  • 相关文献

参考文献14

二级参考文献17

  • 1徐有邻,沈文都,汪洪.钢筋砼粘结锚固性能的试验研究[J].建筑结构学报,1994,15(3):26-37. 被引量:220
  • 2曹晨忠.烷基极化效应的研究[J].化学通报,1995(10):48-51. 被引量:17
  • 3CECS25:90.混凝土结构加固技术规范[S].[S].,..
  • 4中华人民共和国建设部.混凝土结构设计规范[S].北京:中国建筑出版社,2002..
  • 5中华人民共和国建设部.混凝土结构加固技术规范[S].北京:中国建筑工业出版社,1990.
  • 6闫玉红.高温对钢筋混凝土结构植筋锚固性能影响的研究[D].徐州:中国矿业大学建筑工程学院,2005.
  • 7李辉.结构胶植筋锚固及抗震性能的试验研究[D].北京:清华大学,2005.
  • 8EL-HAWARY M M,HAMOUSH S A.Bond shear modulus of reinforced concrete at high temperatures[J].Engineering Fracture Mechanics,1996,55(6):991-999.
  • 9CHIANG C H,TSAI C I.Time-temperature analysis of bond strength of a rebar after fire exposure[J].Cement and Concrete Research,2003,33(10):1651-1654.
  • 10许禄,邵学广.化学计量学方法[M]科学出版社,2004.

共引文献127

同被引文献47

引证文献6

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部