大秦线GSM-R网络补强工程在新建基站过程中需要进行光缆割接施工,文章就既有光缆的割接进行了施工方案的阐述,包括施工内容、施工组织、施工准备、施工方案等内容。
The Datong-Qinhuangdao line of GSM-R network reinforcement works in the new base station during the construction of the need for fiber optic cable cutover,the paper carried on both cable cutover explained the construction program,including the construction of the content,construction organizations,construction preparation,construction plan and so on.