交货期可以指派的供应链排序问题

SUPPLY CHAIN SCHEDULING WITH DUE DATE ASSIGNMENT
原文传递
导出
摘要 考虑了由一个制造商和多个客户组成的供应链系统.每个客户有多个订单交给制造商加工,且每个客户有一个可以接受的完工订单到达时间.制造商可以与客户进行协商来选定合适的交货期.完工的订单是采用直接运输方式分批配送的,每一批配送需要花费一定的时间和费用.目标是对每个订单指派合适的交货期,并且进行生产和配送的排序,以极小化总的交货期指派费用,订单误工费用与配送费用的和.考虑了多种情况,分别给出了相应的算法. A supply chain with one manufacturer and multiple customers is considered. A set of orders needs to be processed by the manufacturer and to be delivered to the customers upon completion. Each customer has a specific acceptable lead time. The manufacturer assigns a due date for one order by negotiating with the customers. The problem is to assign appropriate due date for the orders, and find a joint schedule of order processing at the manufacturer and order delivery from the manufacturer to the customers that minimize the total tardiness, due date assignment and delivery cost. We study the solvability of multiple cases of the problem by providing efficient algorithms.
出处 《系统科学与数学》 CSCD 北大核心 2010年第12期1622-1630,共9页 Journal of Systems Science and Mathematical Sciences
基金 教育部人文社科(09YJC630102)资助项目
关键词 供应链排序 指派交货期 分批配送 动态规划 programming. Supply chain scheduling, due date assignment, batch delivery, dynamic
  • 相关文献

参考文献10

  • 1Hall N G,Potts C N.Supply chain scheduling:Batching and delivery.Operations Research,2003,51:566-583.
  • 2Chen Z L,Variraktarakis G L.Integrated scheduling of production and distribution operations.Management Science,2005,51:614-628.
  • 3Chen Z L.Integrated production and outbound distribution scheduling:Review and extensions.Operations Research,2010,58:130-148.
  • 4Panwallar S S,Smith M L,Seidmann A.Common due date assignment to minimize total penalty for the one machine scheduling problem.Operations Research,1982,30:391-399.
  • 5Seidmann A,Panwalkar S S,Smith M L.Optimal assignment of due dates for a single processor scheduling problem.International Journal of Production Research,1981,19:393-399.
  • 6Gordon V,Proth J M,Chu C B.A survey of the state-of-the-art of common due date assignment and scheduling research.European Journal of Operational Research,2002,139:1-25.
  • 7Shabtay D,Steiner G.Two due date assignment problems in scheduling a single machine.Operations Research Letters,2006,34:683-691.
  • 8Shabtay D,Steiner G.Optimal due date assignment in multi-machine scheduling environments.Journal of Scheduling,2008,11:217-228.
  • 9Chen Z L.Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs.European Journal of Operational Research,1996,93:49-60.
  • 10Shabtay D.Scheduling and due date assignment to minimize earliness,tardiness,holding,due date assignment and batch delivery costs.International Journal of Production Economics,2010,123:235-242.