小浪底水利枢纽大坝帷幕灌浆工程综述

Summary on the dam curtain grouting of Xiaolangdi Multipurpose Project
下载PDF
导出
摘要 小浪底大坝帷幕灌浆工程规模大、难度大, 地质条件复杂, 技术含量高。施工中充分利用了国内外成功的施工手段, 并将国外先进的施工技术与国内成熟的施工工艺相结合, 形成了一系列完善的灌浆工艺。开发引进了稳定性浆液、GIN灌浆法、灌浆过程监控、自动记录等新工艺、新技术; 研制和改进了液压、气压灌浆塞和用于灌浆监控系统的压力、流量监视器等施工机具和仪器, 这些先进的工艺和机具都极具推广应用价值。小浪底的帷幕灌浆施工技术为我国灌浆技术的发展开拓了新的思路。 The curtain grouting project for the dam of Xiaolangdi Multipurpose Project is large in size, big in difficulty, complex in geological conditions and high in technical requirements. In the grouting construction, the construction unit has made full use of the successful construction methods at home and abroad, and combined the foreign advanced construction technologies with the domestic matured construction techniques to form a series of perfected grouting techniques. The new techniques and technologies such as stable grouting slurry production, GIN grouting method, grouting monitoring and automatic recording have been developed and introduced. Some construction tools or devices have been developed and improved, such as hydraulic and pneumatic packers, and the pressure and discharge monitors used in the grouting supervisory system. All these advanced techniques and tools have wide application and popularization value. The construction technologies of curtain grouting for the dam of Xiaolangdi Multipurpose Project have provided new way of the development of grouting technology in our country.
作者 赵存厚
出处 《水力发电》 北大核心 1999年第11期35-38,共4页 Water Power
关键词 大坝 帷幕灌浆 监控 自动记录 心墙堆石坝 dam, curtain grouting, processes monitoring, automatic recording, Xiaolangdi Multipurpose Project
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部