Taum Sauk抽水蓄能工程系列报道(Ⅱ)——Taum Sauk抽水蓄能电站溃坝后的应急响应及造成的影响 被引量:1

Emergency action after dam failure of Taum Sauk project and its bad influence
下载PDF
导出
摘要 Taum Sauk抽水蓄能电站上库坝溃决事件发生后,立即启动了应急管理系统,有效降低了事故造成的不利影响。文章简要介绍了该电站的应急预案、应急响应中各方采取的行动及有待改进的地方,供参考。最后,介绍了失事对当地社会、经济、环境等造成的不利影响,希望引以为戒,提高警惕。 After dam failure of Taum Sauk project, EAP was started up immediately, which reduced the loss caused by the dam breach. This paper introduced the EAP of Taum Sauk project and the emergency actions adopted, for reference.
作者 崔弘毅
出处 《大坝与安全》 2010年第6期57-63,共7页 Dam & Safety
关键词 TAUM Sauk抽水蓄能电站 溃坝 EAP 影响 教训 Taum Sauk pumped storage project failure EAP bad influence lessons
  • 相关文献

参考文献3

  • 1Kevin S. Richards, P. E., P. G. Lessons learned from the fail- ure of the Taum Sauk dam[C]. USSD(United States Society on Dams) Annual Conference; 2007.
  • 2FERC Tanm Sauk Investigation Team. Report of Findings on the Overtopping and Embankment Breach of the Upper Dam- Taum Sauk Pumped Storage Project, FERC No. 2277 [R]. 2006.
  • 3FERC Independent Panel of Consuhants(IPOC). Taum Sauk Upper Dam Breach FERC No. P-2277, Technical Reasons for the Breach of December 14, 2005[R].2006.

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部