摘要
以贵州省某火电厂为例,结合GB50009-2001建筑结构荷载规范,DL/T5339-2006火力发电厂水工设计规范等相关规定,对该工程冷却塔结构优化设计进行了探讨,通过方案比选及相关计算,确定了最佳结构设计方案。
Taking some thermal power plant in Guizhou as the example, the paper, combining with loading regulation for GB 50009-2001 Archi- tectural Structure, DL/T 5339-2006 Hydraulic Structure Design Regulations for Thermal Power Plant, explores the structural optimization design for cooling tower of the project, and identifies the optimized structural design scheme according to the scheme selection and relative calculation.
出处
《山西建筑》
2011年第11期42-43,共2页
Shanxi Architecture
关键词
冷却塔
结构设计
地基处理方案
cooling tower, structural design, foundation treatment scheme