摘要
结合自身工作经验,探讨了后张法预应力张拉及后张孔道压浆两道工序的施工控制要点,分别进行了具体阐述,并提出了相关技术要求及注意事项,以指导实践。
Based on working experience, it discusses the construction control points of the two working procedures including post-tension pres- tressed tension and post-tension pore canal grouting, respectively makes specific illustration, and puts forward corresponding technical requirements and attentions, with a view to guide practice.
出处
《山西建筑》
2011年第11期103-103,共1页
Shanxi Architecture
关键词
后张法
预应力张拉
孔道压浆
post-tension method, prestressed tension, pore canal grouting