期刊文献+

集中供热系统供热首站方案选择和经济性分析 被引量:1

Scheme selection and economic analysis on the first heating supply station of central heating system
下载PDF
导出
摘要 结合集中供热系统热源供热首站方案实例,对直接连接混水+分布式变频泵和间接连接两种方案进行了初投资、运行电耗成本及维护成本等方面的经济技术性分析,得出了在保证系统安全的情况下,采用直接连接混水方案经济性更好的结论。 Based on the first heating supply station scheme case of the central heating system, it carries on economic and technical analysis on the two schemes of directly connecting mixing water + distributive type frequency changing pump and indirectly connecting from aspects of prelim- inary investment, running cost, and maintenance cost and so on, and concludes that the economic property will be better by applying directly connecting mixing waier scheme under the condition of guaranteeing the safe system.
作者 周浩 李小平
出处 《山西建筑》 2011年第11期123-124,共2页 Shanxi Architecture
关键词 集中供热系统 供热首站 直接连接混水 间接连接 central heating system, the first heating supply station, directly connecting mixing water, indirect connection
  • 相关文献

参考文献1

二级参考文献1

共引文献6

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部