摘要
以昆明地铁某车站项目为例,探讨了城市中心区地铁项目的索赔创效方法,针对该工程实际情况,从工程量入手,进行了变更索赔分析,在此基础上提出了关于索赔的具体措施,以指导施工企业有效索赔,增加效益。
Taking Kunming subway station project as the case, it inquires the claim and benefit-creation method for subway project in city center area. In view of the actual condition of the project, starting from the engineering quantity, it carries on change and claim analysis, and proposes specific claim measures, with a view to guide the effective claim of the construction enterprises, and to increase the benefit.
出处
《山西建筑》
2011年第11期234-235,共2页
Shanxi Architecture
关键词
地铁项目
索赔创效
工程量
措施
subway project, claim and benefit-creation, engineering quantity, measures