摘要
结合项目进度管理的基本原则,具体提出了深圳市地形图补测工程项目在加强进度管理方面的对策,并对项目进度控制的实施情况做出了评价,总结了成功经验,以期为类似工程进度管理提供指导。
Integrating with basic principles of the project schedule management, it puts forward strengthening schedule management countermeas- ures for Shenzhen city topographic map field completion engineering project in detail, evaluates the implementation condition of the project schedule controlling, and summarizes successful experiences, with a view to provide guidance for similar engineering schedule management.
出处
《山西建筑》
2011年第11期245-246,共2页
Shanxi Architecture
关键词
项目管理
工程进度
数字化地形图
project management, engineering schedule, digitized topographic map