炼厂扩建改造项目施工进度控制与质量管理 被引量:1

The Schedule Control and Quality Management of Enlarging and Altering Project Construction of Refinery
下载PDF
导出
摘要 施工项目进度控制与投资控制、质量控制一样,是保证施工项目按期完成、合理安排资源供应、节约工程成本的重要措施。根据项目管理学的基本理论,以石化扩改项目为例,对影响施工项目进度的因素作了简要概述,同时提出了相应的控制措施。 Like the investment control and quality control,the schedule control of construction project was an important measure to guarantee the accomplishment of construction project on time,the reasonable arrangement of resource supply,and the economization of project cost.According to the basic theory of project management,some factors influencing the schedule of project construction were explained by the example of enlarging and altering project in petrochemical company,followed by the presentation of some relative control measures.
作者 阎小利
出处 《广州化工》 CAS 2011年第6期194-195,共2页 GuangZhou Chemical Industry
关键词 炼厂 项目改造 进度控制 质量管理 refinery technology renovation schedule control quality management
  • 相关文献

参考文献9

二级参考文献4

  • 1[1]全国建筑业企业项目经理培训教材编写委员会.施工组织设计与进度管理.中国建筑工业出版社,2002
  • 2[2]刘伊生主编.工程造价管理基础理论与相关法规.中国计划出版社,2006.
  • 3GB/T50326-2006,建设工程项目管理规范[S].
  • 4李延宾.浅谈建设项目的影响因素[J].邯郸大学学报,2000,13(3):30-31. 被引量:1

共引文献29

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部