金川镍闪速炉余热锅炉扩能改造 被引量:2

Upgrading and Reconstruction of the Nickel Flash Furnace WHB in JNMC
下载PDF
导出
摘要 金川集团有限公司镍闪速炉余热锅炉运行18年后已不能适应冶金工艺的生产要求,需要进行彻底的技术改造。中国恩菲工程技术有限公司承担了余热锅炉改造的设计工作。本文对原有余热锅炉运行中存在的问题进行了细致的分析,并详细介绍了改造后余热锅炉的技术特点。 The waste heat boiler(WHB) of flash furnace in Jinchuan Nickel Material Company(JNMC) has been running nearly 18 years long,it is already not competent for the smelting production requirement.The reconstruction is demanded to be carried out imminently.ENFI takes the design task for the reconstruction of WHB.In this article,the problems which existed in the old WHB running process have been deeply analyzed,and technology characteristics after reconstructing are introduced in details.
出处 《铜业工程》 CAS 2011年第1期35-37,45,共4页 Copper Engineering
关键词 闪速炉 余热锅炉 设计 flash furnace Waste Heat Boiler design
  • 相关文献

参考文献5

  • 1Rauno Peippo, Hannu Holopainen,Jari Nokelainen, Copper smelter waster heat boiler technology for the next millennium, Proceedings of Copper 99 International Conference( C), Vol. V - Smelting Operation and Advances, Edited by D. B. George, W. J. (Pete) Chen, P. J. Mackey and A. J. Weddick, the Minerals, Metals&Materials Society, 1999 : 71 - 82.
  • 2张更生.金川镍闪速炉以煤代油技术的开发应用[J].有色金属(冶炼部分),2005(1):22-26. 被引量:1
  • 3刘林华,杨有才.SO_2气体的辐射特性[J].热能动力工程,1999,14(4):293-295. 被引量:3
  • 4王岗,劳学竞,德强.贵溪冶炼厂闪速炉余热锅炉改造[J].有色金属(冶炼部分),2005(1):11-14. 被引量:9
  • 5R. Fuentes, P. Ruz, H. Jara, L. Salinas, M. Rosales, M. Cruz, A. Moyano, N. Perez, F. rojas, Flow pattern in the waste heat boiler of Chuquicamata's flash furnace, COPPER 2003 ( C ), Volume Ⅳ - Pyrometallurgy of Copper, The Hermann Schwarze Symposium on Copper Pyrometallurgy, Santiago, Chile, Edited by C. Diaz, C. Landoit, T. Utigard, 227 - 240.

二级参考文献7

  • 1王学良.闪速炉余热锅炉低负荷运行与调节[A].第三届全国余热锅炉技术交流大会论文集[c].余热锅与余热利用设备科技情报网,湖南湘潭[M].,199:48—54..
  • 2北京有色冶金设计院.余热锅炉设计与运行[M].北京:冶金工业出版社,1982..
  • 3陈先斌.贵溪闪速炉余热锅炉的设计特点[A].余热锅炉与余热利用设备科技情报网第七届网员大会论文集[c].余热锅炉与余热利用设备科技情报网,杭州[M].,1998:23—25..
  • 4Rauno Peippo, hannu Holopainen, Jari Nokelainen. Copper smelter waster heat boler technolgy for the next millennium[A]. Procedings of Copper 99 International Conference, Vol. V-Smelting Operation and Advances[C], Edited by D B George, W J(Pete) Chen, P J Mackey, et al, the Minerals. metals & Materials Society, 1999 : 71 - 82.
  • 5Y Yang, A Jokilaakso, J Jarvi. Gas Flow and Cooling in Waster Heat Boiler in the Outokumpu Flash Smelting Proces[A]. Sulfide Smehing 98: Current and Future Practices[C]. Edited by J A Asteljoki, R L Stephens, the Minerals, Metals & Materials Society, 1998:417- 431.
  • 6Patrlcio Barrios, Jesus C~ntreras, Miguel Palacios. Recent Operations at the Atlamlc Copper Smeher in Huelval[ A].Sulfide Smehing 98: Current and Future Practices[ C].Edited by J A Asteljoki, R L Stephens, the Minerals,Metals & Materials Society, 1998:135 - 146.
  • 7涂俊杰.浅析铜闪速炉余热锅炉中硫酸盐化装置的作用[J].有色冶金设计与研究,1998,19(4):40-44. 被引量:4

共引文献10

同被引文献11

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部