某石灰石矿隔离矿柱厚度的确定 被引量:17

Determination of thickness of insulating pillar in a limestone mine
下载PDF
导出
摘要 根据对某石灰石矿的现场工程地质调查、评价以及室内岩石力学实验等,确立了该矿的岩体力学参数。采用三种理论方法以及数值模拟技术对该矿的隔离矿柱厚度、目前采空区及下步采场的稳定性进行了分析,得出该石灰石矿采空区下开采的结构参数为矿房15 m,房间柱12 m时,维持该矿上下分层稳定的隔离矿柱厚度应在12 m以上。 According to the engineering geology survey and evaluation of the area of a limestone mine and indoor rock mechanics tests,the rock mass mechanics parameters were obtained in this paper.The thickness of insulating pillar and the stability of the goaf at present were analyzed using three theory methods and numerical simulation.The result showed that when the chamber width was 15 m and the pillar was 12 m,the thickness of the insulating pillar should be more than 12 m.
出处 《有色金属(矿山部分)》 2011年第2期64-68,共5页 NONFERROUS METALS(Mining Section)
关键词 石灰石矿 隔离矿柱 理论方法 数值模拟 limestone mine insulating pillar theory method numerical simulation
  • 相关文献

参考文献6

二级参考文献29

共引文献176

同被引文献95

引证文献17

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部