摘要
阐述了渤西油田群Ⅰ期开发工程平台大组块整体方案的产生、发展和实施过程。其思路和实践对海洋工程有一定借鉴价值。
It is expounded in detail the whole cause of development and implementation of integral platform modular for Boxi offshore oil field. Its concept and practice could be a reference to other offshore oil development projects.
关键词
渤西油田群
整体方案
海上平台
海上油气田
安装
Boxi offshore oil field, offshore engineering, integral project, slide to barge, cost reduction