摘要
采用不停产程序更换单点旋转接头,克服了原设计中工艺流程的不足,为今后海上单点系泊的检修提供了成功经验。
Adopting the program of replacing slewing swivel for SPM during running, has overcome the problem occurred in original process design, and has provided successful experience for the field inspection of SPM in the future.
出处
《中国海上油气(工程)》
1999年第5期36-38,共3页
China Offshore Oil and Gas