Optimal Replacement Policy for Cold Standby System 被引量:6

Optimal Replacement Policy for Cold Standby System
下载PDF
导出
摘要 Investigators are attracted by the complexity and significance of preventive maintenance problem,and there are hundreds of maintenance models and methods to solve the maintenance problems of companies and army,going with a lot of investigative harvests. However,one-component system or series system is focused by most of the literature.The problem of preventive maintenance(PM) on cold standby repairable system does not attach importance despite the fact that the cold standby repairable system is ubiquitous in engineering systems.In this paper,an optimal replacement model for gamma deteriorating system is studied.This methodology presented uses a gamma distribution to model the material degradation,and the impact of imperfect maintenance actions on system reliability is investigated.After an imperfect maintenance action,the state of a degrading system is assumed as a random variable and the maintenance time follows a geometric process.A maintenance policy(N)is applied by which the system will be repaired whenever it experiences the Nth PM,and an optimal policy(N~*) could be determined numerically or analytically for minimizing the long-run average cost per unit time.A numerical example about how to confirm the optimal maintenance time by the inspecting information of liquid coupling device is given to demonstrate the use of this policy.This paper presents a condition-based replacement policy for cold standby repairable system under continuous monitoring.Its contribution embody in two aspects,relaxing the restrictions of hypothesis and investigating the condition-based maintenance policy of the cold standby repairable system which is ignored by others. Investigators are attracted by the complexity and significance of preventive maintenance problem,and there are hundreds of maintenance models and methods to solve the maintenance problems of companies and army,going with a lot of investigative harvests. However,one-component system or series system is focused by most of the literature.The problem of preventive maintenance(PM) on cold standby repairable system does not attach importance despite the fact that the cold standby repairable system is ubiquitous in engineering systems.In this paper,an optimal replacement model for gamma deteriorating system is studied.This methodology presented uses a gamma distribution to model the material degradation,and the impact of imperfect maintenance actions on system reliability is investigated.After an imperfect maintenance action,the state of a degrading system is assumed as a random variable and the maintenance time follows a geometric process.A maintenance policy(N)is applied by which the system will be repaired whenever it experiences the Nth PM,and an optimal policy(N~*) could be determined numerically or analytically for minimizing the long-run average cost per unit time.A numerical example about how to confirm the optimal maintenance time by the inspecting information of liquid coupling device is given to demonstrate the use of this policy.This paper presents a condition-based replacement policy for cold standby repairable system under continuous monitoring.Its contribution embody in two aspects,relaxing the restrictions of hypothesis and investigating the condition-based maintenance policy of the cold standby repairable system which is ignored by others.
出处 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2011年第2期316-322,共7页 中国机械工程学报(英文版)
基金 supported by National Natural Science Foundation of China(Grant No.60904002)
关键词 cold standby system maintenance policy gamma process geometrical process imperfect maintenance cold standby system maintenance policy gamma process geometrical process imperfect maintenance
  • 相关文献

参考文献1

共引文献2

同被引文献30

  • 1Zhao Jianmin(Shijiazhuang Mechanical Engineering College, 050003, P. R. China )Zhao JianhuaShijiazhuang Education College, 050000, P. R. China.An Optimal Replacement Policy for a System with Finite Spares[J].Journal of Systems Engineering and Electronics,1999,10(3):76-81. 被引量:1
  • 2刘宝友,方攸同,魏金祥,王永亮.状态维修机械设备的可靠性和检测更换策略[J].机械工程学报,2006,42(3):30-35. 被引量:20
  • 3王正,谢里阳,张君一.载荷多次作用下的共因失效系统可靠性模型[J].航空学报,2007,28(B08):116-120. 被引量:10
  • 4Subramanian R.Adaptive Caches: Effective Shaping of Cache Behavior to Workloads[C]. 1995.
  • 5Steven P Vanderwiel, David J Lilja, Data Prefetch Mecha- nisms[C].ACM Computing Surveys (CSUR), 2000.
  • 6Wong W A, Baer J L. Modified LRU Policies for Improving Second-level Cache Behavior[C].ACHPCA-6, 2000. Z.
  • 7huang Weiqiang, Hu min, Wang Dingxing.Replacement Pol- icy for Caching World-Wide Web Documents Based on Site- Graph Model[C].Tsinghua Science and Electronics, 2001.
  • 8Lin W, Fide C, Falsafi B. Predicting Last-touch References under Optimal Replacement[R].Technical Report of Michigan University, 2002.
  • 9Megiddo N,Modha D S.ARC: A Self-tuning, Low Overhead Replacement Cache[C].Proceeding of the 2d USENIX Confer- ence on File and Storage Technologies, 2003.
  • 10Qureshi M K, Thompson D, Patt Y N. The V-Way Cache: Demand Base Associativity via Global Replacement[J].ISCA, 2005(32):544-555.

引证文献6

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部