摘要 淮钢80 t转炉特钢生产线负能炼钢攻关的主要方法为:加强生产组织和协调保证生产线稳产、高产,节约水、电、气等能源消耗,提高煤气回收数量和利用率,提高蒸气回收和利用率等。 The main methods of negative energy steelmaking on the special steel production line with 80t converter are the following: strengthening the production organization and coordination to keep a stable and high production,reducing energy consumption such as water,electricity and gas,and increasing the recovery and use factors of coal gas and steam.
出处 《中国冶金》 CAS 2011年第3期20-23,共4页 China Metallurgy
关键词 转炉 负能炼钢 实践 converter negative energy steelmaking practice
  • 相关文献

同被引文献19

  • 1Harada H. A Status Report on FASTMET Process From theKakogawa Demonstration Plant [J]. Iron and Steelmaker,1997,24 .5):51.
  • 2Nicholas P, Cahty C,Charlene C,et al. Technology to CoolDown Global Warming[J]. Chem Eng, 1999 ,106 : 37.
  • 3王涛,任立军,魏红旗.首钢京唐公司5500 m3高炉低碳生产[N].世界金属导报,2010-05-11.
  • 4Danloy G,Van de Stel J, Schmole P, Heat and Mass Balancesin the ULCOS Blast Furnace[C]//Proceedings of the 4th UlcosSeminar, 2005.
  • 5朱苗勇.现代冶金学(钢铁冶金卷)[M].北京:冶金工业出版社,2009.
  • 6中国工程院.中国能源中长期发展战略研究[R].北京:中国工程院,2009.
  • 7Janz J. Injecting Plastic Scrap Into the Blast Furnace [J].Steel Times,1995,223(6) :216.
  • 8Demirba§ A, Biomass Resource Facilities and Biomass Conver-sion Processing for Fuels and Chemicals[J]. Energy Conver-sion and Management,2001,42(11) :1357.
  • 9Braga R N, Goncalves H T, Santiago R, et al. Injection ofPulverized Charcoal Into No. 2 Blast Furnace of Acesita[J].Metalurgia ABM, 1986,42 :389.
  • 10Nascimento R, Almeida A, Oliveira E,et al. 18 Months of Char-coal Fines,Injection Into Gusa Nordeste1 s Blast Furnaces[C]//Proceedings of 3rd International Meeting on Ironmaking and the2 nd International Symposium on Iron Ore. Maranhao : ABM Pub-lishers, 2008: 845.

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部