AP1000蒸汽发生器制造难点分析 被引量:17

Manufacturing difficulties analysis of AP1000 steam generator
下载PDF
导出
摘要 通过总结浙江三门核电站在建的全球首台AP1000核电机组蒸汽发生器制造过程中所遇到的部分制造难题,简要分析其制造要点,为后续AP1000核岛主设备国内制造提供借鉴和参考。 Through summarizing the manufacturing difficulties during manufacture of the global first AP1000 steam generators for Zhejiang Sanmen Nuclear Power Plant,and the manufacturing essentials are briefly analyzed,with an aim to provide reference to the follow-up main equipment of AP1000 nuclear island which shall be locally manufactured.
作者 王培河
出处 《中国核电》 2011年第1期52-59,共8页 China Nuclear Power
关键词 三门核电站 AP1000核电机组 蒸汽发生器 Sanmen Nuclear Power Plant AP1000 nuclear power unit steam generator
  • 相关文献

参考文献5

  • 1Westinghouse Electric Company.APl000 Steam Generator design specification APP-MB01-Z0-101 Rev. 2, 2009.
  • 2Doosan Heavy Industries&Construction. Material Purchase Specification for SA-508 Grade3 Class2 Forgings for AP1000 Project CA-MPS21-001 Rev. 2, 2009.
  • 3Doosan Heavy Industries&Construction. Tube Sheet Drilling for AP1000 Steam Generator Rev. 1, 2009.
  • 4丁训慎.压水堆核电站蒸汽发生器的制造.核电站,2003,.
  • 5邹小平,顾振波.秦山核电二期600MW蒸汽发生器关键焊接技术[J].锅炉技术,2006,37(4):5-8. 被引量:8

二级参考文献1

  • 1ASME锅炉及压力容器委员会材料分委员会.ASME锅炉及压力容器规范(92版)(中文版)[M].北京:1993.

共引文献19

同被引文献77

引证文献17

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部