摘要
介绍了九钢烧结二车间180m2烧结机,自投产以来生产状况及出现的问题,通过近期的技术改造,使烧结机全面达产。
The operation status and problems after put-into-operation of 180 m^2 sinter machine in Jiujiang Steel Works are explained.The technical improvement measures taken for reaching design capacity of the sinter machine are introduced.
出处
《矿业工程》
CAS
2011年第2期34-36,共3页
Mining Engineering
关键词
180m2烧结机
技术改造
达产达标
180 m^2 sinter machine
technical improvement
reaching design capacity and indexes