3Dominguez J P. Upgrading old coolers[J]. World Cement,2001,32(4) : 43-44.
4Brunet D, Meyer H. Lowering clinker cooler operating costs through new grate plates, "Compact Swing" support of the grate, "LevelRadar" grate speed control and waste heat recovery[ J ]. ZKG International, 2000 ,53:216-225.
5Bentsen B. The SF cross bar-cooler for modernization of kiln I at the assiut cement works[J]. ZKG International, 2003 ,56:35-40.
6Mevsmann M. The new pyrofloor/spl reg/ clinker cooler with low maintenance demand and high efficiency [ J ]. Cement industry technical conference, 2005, (5) : 274-286.
7Tahsin E,Vedat A. Energy auditing and recovery for dry type cement rotary kiln systems-A case study[J]. Energy conversion and management, 2005, 46(4) : 551-562.
8Chavarro A, Patel K, Knabbe J, et al. Clinker cooler hydraulic drives [ J ]. Cement Industry Technical Conference,2003, (5) : 57-73.