3STAMATELATOS M. Probabilistic risk assessment procedures guide for NASA managers and practitioners[ R]. [ S. l. ] :NASA Headquarters Office of Safety and Mission Assurance (OSMA) ,2002:1-50.
4BORGONOVO E, APOSTOLAKIS G E. A new importance measure for risk-informed decision making [ J ]. Reliability Engineering and System Safety,2001,72 ( 2 ) : 193- 212.
5WINKLER R L. Uncertainty in probabilistic risk assessment[ J]. Reliability Engineering and System Safety, 1996, 54(2 ):127-132.
6LI B, LI M, GHOSE S, et al. Integrating software into PRA : proc. of the 14th International Symposium on Software Reliability Engineering (ISSRE'03) [C]. [S.l. ]:[s.n. ],2003.