Buffer Sizing Method for Constructing Stable Schedules with Duration Constraints

Buffer Sizing Method for Constructing Stable Schedules with Duration Constraints
下载PDF
导出
出处 《Journal of Civil Engineering and Architecture》 2010年第10期24-30,共7页 土木工程与建筑(英文版)
关键词 尺寸稳定 缓冲区 时间约束 构造方法 项目调度 工程规划 施工阶段 不确定性 Construction project scheduling, stable solution, robust schedule, buffering, risk management,
  • 相关文献

参考文献20

  • 1P. Jaskowski and S. Birttk, The work continuity constraints problem in construction projects' network models, Archives of Civil Engineering LV (1) (2009) 29-41.
  • 2O. Kaplinski, Planning instruments in construction man-agement, Technological and Economic Development of Economy 14 (4) (2008) 449-451.
  • 3P. Jagkowski and A. Sobotka, Scheduling construction projects using evolutionary algorithm, Journal of Construction Engineering and Management 132 (8) (2006) 861-870.
  • 4S. Christodoulou, Construction imitating ants: Resource-unconstrained scheduling with artificial ants, Automation in Construction 18 (3) (2009) 285-293.
  • 5S. S. Liu and Ch. J. Wang, Resource-constrained construction project scheduling model for profit maximization considering cash flow, Automation in Construction 17 (8) (2008) 966-974.
  • 6O. Kapliflski and L. Janusz, Three phases of multifactor modelling of construction processes, Journal of Civil Engineering and Management 12 (2)(2006) 127-134.
  • 7Y. Ben-Haim and O. Laufer, Robust reliability of projects with activity-duration uncertainty, Journal of Civil Engineering and Management 124 (2) (1998) 125-132.
  • 8S. Biruk and P. Jagkowski, Simulation modelling construction project with repetitive tasks using Petri nets theory, Journal of Business Economics and Management 9 (3) (2008) 219-226.
  • 9T. Blaszczyk and M. Nowak, The time-cost trade-off analysis in construction project using computer simulation and in-teractive procedure, Technological and Economic Development of Economy 15 (4) (2009) 523-539.
  • 10S. Van de Vonder, E. Demeulemeester, R. Leus and W. Herroelen, The use buffers m project management: The trade-off between stability and makespan, International Journal of Production Economics 97 (2) (2005) 227-240.