Buffer Sizing Method for Constructing Stable Schedules with Duration Constraints
Buffer Sizing Method for Constructing Stable Schedules with Duration Constraints
参考文献20
-
1P. Jaskowski and S. Birttk, The work continuity constraints problem in construction projects' network models, Archives of Civil Engineering LV (1) (2009) 29-41.
-
2O. Kaplinski, Planning instruments in construction man-agement, Technological and Economic Development of Economy 14 (4) (2008) 449-451.
-
3P. Jagkowski and A. Sobotka, Scheduling construction projects using evolutionary algorithm, Journal of Construction Engineering and Management 132 (8) (2006) 861-870.
-
4S. Christodoulou, Construction imitating ants: Resource-unconstrained scheduling with artificial ants, Automation in Construction 18 (3) (2009) 285-293.
-
5S. S. Liu and Ch. J. Wang, Resource-constrained construction project scheduling model for profit maximization considering cash flow, Automation in Construction 17 (8) (2008) 966-974.
-
6O. Kapliflski and L. Janusz, Three phases of multifactor modelling of construction processes, Journal of Civil Engineering and Management 12 (2)(2006) 127-134.
-
7Y. Ben-Haim and O. Laufer, Robust reliability of projects with activity-duration uncertainty, Journal of Civil Engineering and Management 124 (2) (1998) 125-132.
-
8S. Biruk and P. Jagkowski, Simulation modelling construction project with repetitive tasks using Petri nets theory, Journal of Business Economics and Management 9 (3) (2008) 219-226.
-
9T. Blaszczyk and M. Nowak, The time-cost trade-off analysis in construction project using computer simulation and in-teractive procedure, Technological and Economic Development of Economy 15 (4) (2009) 523-539.
-
10S. Van de Vonder, E. Demeulemeester, R. Leus and W. Herroelen, The use buffers m project management: The trade-off between stability and makespan, International Journal of Production Economics 97 (2) (2005) 227-240.
-
1HAO SUN,PU LIU,JIKAI LI,DECHUNG PENG(National Key Laboratory Of Software Engineering,Wuban Unfuersity mahan, 430072, P.R China. Institute of software, Chinese Academy of Sciences, Beijing, 10080, P.R China.).NEW BOUNDS ON TIME AND NUMBER OF PROCESSORS FOR MULTIPROCESSOR OPTIMAL SCHEDULES[J].Wuhan University Journal of Natural Sciences,1996,1(Z1):350-355.
-
2李玉峰,邱菡,兰巨龙,汪斌强.TCP流竞争拥塞及拥塞链路的缓存需求研究[J].软件学报,2008,19(6):1499-1507. 被引量:4
-
3刘永庆.液晶显示屏玻璃基片的网版印刷[J].网印工业,2006(4):14-17.
-
4李裕连,韦晓娟.UG环境下某种车型的尾门装配工具开发研究[J].中国高新技术企业,2014(23):15-17. 被引量:1
-
5Vaishali P.Sadaphal,Bijendra N.Jain.Random and Periodic Sleep Schedules for Target Detection in Sensor Networks[J].Journal of Computer Science & Technology,2008,23(3):343-354. 被引量:1
-
6刘国鑫,谭国强,贺也平.同步数据流模型调度序列的空间优化[J].计算机工程与应用,2009,45(3):198-201.
-
7PC磨砂型片材[J].国外塑料,2008,26(9):87-87.
-
8徐刚,吴智铭.Kind of deadlock-free scheduling method[J].Journal of Systems Engineering and Electronics,2004,15(3):399-406.
-
9程实.UPM关闭位于Leivonmaki的锯材厂[J].国际木业,2008(10):41-42.
-
10文羽.雕木如诗——明椅的制作工艺[J].读者欣赏,2015,0(7):52-54.