期刊文献+

高速铁路列车运行冲突管理总论 被引量:10

Pandect on the Operation Conflict Management of High-speed Train
下载PDF
导出
摘要 为提高铁路行车指挥水平、保障行车安全,研究了高速铁路列车运行冲突管理问题。以高速铁路运输系统特点分析为基础,在定义高速铁路列车运行冲突后,对列车运行冲突从4个不同角度进行分类。分析列车运行冲突的特点,阐述高速铁路列车运行冲突管理的内涵。列车运行冲突的形成机理研究、冲突分析、冲突消解和基于冲突管理的列车运行调整方法和运行图研究等问题构成中国高速铁路冲突管理的主要研究框架体系。高速铁路冲突管理理论体系的研究是高速铁路运输组织优化的关键问题之一,是高速铁路行车安全的重要保障。 In order to support the improvement of railway control level and provide guarantee for train operation safety,the study of train operation conflict management is carried out.On the bases of analyzing the characteristics of high-speed rail system,the conflicts are classified from 4 aspects after defining the train operation conflict for high-speed rail.And the characteristics of train operation conflicts are analyzed.The main contents of train operation conflict management for high-speed rail in China are given.Formation of train operation conflicts,conflict analysis,conflict resolution,train operation adjustment method and operation plan optimization and other issues based on conflict management constitute the main framework of conflict management.The theory system study of train operation conflict management for high-speed rail is one of the key issues of railway operation organization and it is the important guarantee for the safety of high-speed rail.
出处 《中国安全科学学报》 CAS CSCD 北大核心 2010年第10期8-12,共5页 China Safety Science Journal
基金 国家科技支撑计划项目(2009BAG12A10) 高等学校博士点基金资助(20090184110011)
关键词 高速铁路 列车运行冲突 冲突分析 冲突管理 框架体系 high-speed rail train operation conflict conflict analyses conflict management framework system
  • 相关文献

参考文献11

  • 1Szpigel,B. Optimal train scheduling on a single line railway[J]. Operations Research,1973,7(2):344-351.
  • 2周磊山,秦作睿.列车运行计划与调整的通用算法及其计算机实现[J].铁道学报,1994,16(3):56-65. 被引量:52
  • 3Ho,T. K. Optimal &Norton ,J. P. Traffic control at railway junctions[J].IEE Proceedings of Electric Power Applications, 1997, 144(2) : 140-148.
  • 4Tornquist, J. Computerbased decision support for railway traffic scheduling and dispatching : A review of models and algorithms[A]. Proceedings of the 5th Workshop on Algorithmic Methods and Models for Optimization of Railways[C]. Palma de Mallorca, Spain, Dagstuhl Research Online Publication Server ,2005:1-23.
  • 5Jianxin Yuan and Ingo A. Hansen. Closed form expressions of optimal buffer times between scheduled trains at railway bottlenecks[A]. Proceedings of the 11 th International IEEE Conference on Intelligent Transportation Systems[C]. IEEE Computer Society Press, 2008:675-680.
  • 6聂磊,张星臣,赵鹏,杨浩,胡安洲.高速铁路列车运行调整策略的研究[J].铁道学报,2001,23(4):1-6. 被引量:27
  • 7Л.C.格伦托夫[前苏].车站运营可靠性[M].陈秀凤,阎长安译.北京:中国铁道出版社,1991:3-4.
  • 8张星臣,胡安洲,杨浩.一种基于有控随机与随机有控约束的列车运行仿真模型[J].铁道学报,1995,17(3):21-27. 被引量:6
  • 9李旭升.冲突管理[M].北京:北京大学出版社,2008:2-4.
  • 10乌鲁木齐铁路局.车务行车规章应知必会问答(第2版)[M].北京:中国铁道出版社,2008:19.

二级参考文献68

共引文献87

同被引文献81

引证文献10

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部