摘要
某厂8台300 MW机组均由东方锅炉厂制造,其中8号炉自投产以来就有严重的结渣。掺放较易结渣的蔚州煤后,6号炉也出现结渣。通过对两台锅炉结渣的特点深入分析,找到了各自结渣的原因,并进行了相应的设备治理与运行参数调整工作,取得了良好的效果。两台锅炉都彻底根除了结渣问题,并可以燃用100%的蔚州煤。
Dongfang boiler works manufactures all of 8 units of a power plant.Unit No.8 has severe slagging since its commissioning.And for Unit No.6,furnace slag also appears after burning mixed coal of easy slagging Yuzhou coal.Through two slagging features in-depth analysis,their slagging reasons were found,appropriate equipment control and operating parameters adjust were made.The work achieved very nice results: slagging problem of two boilers are eradicated,and both can be fueled with 100% of the Yuzhou coal.
出处
《电站系统工程》
北大核心
2011年第2期19-21,共3页
Power System Engineering
关键词
热能动力工程
燃烧调整
结渣
燃烧器
thermal power engineering
combustion adjustment
slagging
burner