摘要
为使排放烟气中SO_2浓度达到相关排放标准的要求,某电厂采取石灰石—石膏湿法对2台300 MW和1台600 MW发电机组的烟气进行脱硫改造。介绍了该烟气脱硫改造工程的设计流程、设备选型及工艺系统的主要特点,供同行参考。
In order to make sulfur dioxide content in the discharging flue gas meet the requirements of discharge standards concerned,one power plant adopts limestone gypsum wet process to carry out the flue gas desulfurization revamp for two pieces of power generators with 300 MW and one piece of power generator with 600 MW.The design flow,equipment selection and main features of process system for the revamp project of flue gas desulfurization are outlined for reference.
出处
《硫磷设计与粉体工程》
2011年第2期17-22,4,共6页
Sulphur Phosphorus & Bulk Materials Handling Related Engineering
关键词
烟气脱硫
石灰石—石膏湿法脱硫
改造
设计
介绍
flue gas desulfurization
limestone gypsum wet flue-gas desulfurization
revamp
design
description