摘要
从分析Mesh网络结构着手,提出并研究了Mesh网络故障下可能出现的极长连接问题,并从系统误码性能、同步时钟链路2个方面提出了光缆传输智能Mesh网络规划的基本要求。
Beginning with the analysis of meshwork structure, it brings forward maximum distance link of meshwork in fault and studies it. It proposes the basic requirements on ASON meshwork plan,which is based on error performance of transmission system and synchronous clock link.
出处
《邮电设计技术》
2011年第3期44-47,共4页
Designing Techniques of Posts and Telecommunications