关角隧道大变形处理技术 被引量:19

Large Deformation Treatment Technology of Guanjiao Tunnel
下载PDF
导出
摘要 关角隧道全长32.645 km,为目前国内在建的最长的单线铁路隧道。隧道通过区岩性极其复杂,沉积岩、岩浆岩、变质岩三大岩类均有出露,断裂构造极为发育,通过大小不等断层共17条,其中二郎洞断层束长达2 355 m,且具有一定的高地应力。受复杂地质的影响,关角隧道施工中发生了不同程度的大变形,最大变形达到了505 mm,现场对发生变形段采取了横撑、长锚杆、径向注浆、二次支护等措施进行加强,对未开段采取了加强初期支护、双层初期支护、调整初期支护曲率等措施来抑制变形并取得了成功。 Guanjiao tunnel is the longest single-track railway tunnel under construction in China,with a total length of 32.645 km.The geological conditions are extremely complicated.There are 17 major faults,among which Erlangdong fault(2 355 m) contains high earth stress,with sedimentary rocks,igneous rocks and metamorphic rocks included in this section.Large deformation occurs during construction because of complicated geological conditions,the maximum deformation being 505 mm.Crossbars,long bolts,radial grouting,secondary support and other measures are taken to strengthen surrounding-rock in deformation fields.Measures(strengthening primary support,using double primary support,revising the curvature of primary support,et al) are successfully taken to control the large deformation in non-excavation fields.
作者 张旭珍
出处 《石家庄铁道大学学报(自然科学版)》 2011年第1期17-20,共4页 Journal of Shijiazhuang Tiedao University(Natural Science Edition)
关键词 隧道 钻爆法 大变形 处理方案 tunnel drilling and blasting method large deformation treatment scheme
  • 相关文献

参考文献2

二级参考文献2

共引文献17

同被引文献152

引证文献19

二级引证文献111

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部