摘要 针对如何识别影响整个项目进度的关键工序的问题,提出了面向计划评审技术(PERT)的工序综合重要度分析方法。首先将PERT中工序按照时序关系划分为始工序节点、终工序节点、紧前工序节点和紧后工序节点,并给出了对应工序时间的概率分布计算方法。然后,基于PERT中不同工序对项目整体进度的影响程度,提出了工序综合重要度分析方法,并研究了基于工序综合重要度的PERT关键工序识别方法。最后,以神舟飞船研制过程甘特图为例说明了基于工序综合重要度的关键工序识别过程,验证了工序综合重要度与工序持续时间之间的关联关系。 Aiming at identifing the key process which affects the project schedule mostly, it proposes the procedure integrated importance measures for program evaluation and review technique (PERT). Firstly, it classifies the procedures in PERT as start procedure nodes, final procedure nodes, predecessor procedure nodes and successor procedure nodes based on their orders in the model. Then it shows the detail about the time probability distribution calculations of such procedures, defines the procedure integrated importance measures for PERT based on their impact on the project schedule. According to the integrated importance measures, it implements the key procedure identification in PERT. It applies the case of Shenzhou spacecraft design Gantt chart to demonstrate the step of key procedure identification and to verify the relationships between the importance values and the durations of procedures in PERT.
作者 金勇 赵志纲
出处 《中国制造业信息化(学术版)》 2011年第4期54-57,共4页
基金 民用飞机关键技术预先研究项目(2009ZE53052)
关键词 计划评审技术 工序 综合重要度 概率分布 Program Evaluation and Review Technique Procedure Integrated Importance Measure Probability Distribution.
  • 相关文献

参考文献14

  • 1Malcolm D G, Roseboom J H, Clark C E , et al. Application of a technique for research and development program evaluation[J ]. Operations Research, 1959,7 (5) : 646 - 669.
  • 2Miller R W. How to plan and control with PERT[J]. Harvard Business Review, 1962(40) :93 - 104.
  • 3Booth D E , Isenhour T L. Using PERT methodology in nuclear material safeguards and chemical process control [ J ]. Environ- mental Modeling and Assessment,2000,5(3) : 139- 143.
  • 4Babczyfiski T, Magott J. PERT based approach to performance analysis of multi - agent systems[ J ]. Artificial Intelligence andSoft Computing,2006,40(29) : 1 I)40 - 1 049.
  • 5Morales - Sdnchez V, Hemdndez - Mendo A, Salnchez - Algar- ra P , et al. Random PERT: application to physical activity/ sports programs[J]. Quality & Quantity, 2009,43 (2) : 225 - 236.
  • 6吴其苗.PERT时问参数的算法及工期费用的优化[J].绍兴文理学院学报(自然科学版),2001,21(4):4-8. 被引量:2
  • 7戈闻怡,韩晓龙.PERT技术在供应链管理环境下企业业务流程重构中的应用[J].物流技术,2003,22(3):95-98. 被引量:2
  • 8Bimbaum Z W. On the importance of different components in a multi-component system [ M]. New York: Academic PreKs, 1969:581 - 592.
  • 9Nlrtow R E, Proschan F. Importance of system comtx)nents and fault tree analysis E D]. Berkeley: Operation Research Center, U- niversity of C.alifomia, Berkeley, 1974.
  • 10Gmldini A. Importance & sensitivity analysis in assessing systemreliability[J ]. IEEE Trans, 1990,39( 1 ) :61 - 69.

二级参考文献3

  • 1唐纳德J鲍尔索克斯 戴维J克劳斯.物流管理:供应链过程的一体化[M].北京:机械工业出版社,1999..
  • 2吴鼎贤编著.建筑工程现代管理量化与优化方法[M]. 地震出版社, 1999
  • 3蓝伯雄,郑晓娜,徐心.电子商务时代的供应链管理[J].中国管理科学,2000,8(3):1-7. 被引量:118

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部