1Fu R L, Shaw J. Reengineering the order fulfilment process in supply chain network [ J ]. International Journal of Flexible Manufacturing System, 1998, (10) : 199 - 200.
2Mandal A, Deshmukh S G. Vendor selection using interpretive structural modeling[ J ]. IJOPM, 1994,14 ( 6 ) :31 - 33.
3Weber C A, Current J R, Benton W C. Vendor selection criteria and methods [ J ]. European Journal of Operational Research, 1991(7) : 50 -51.
4Porter A M. Purchasing: A purchasing manager's guide to the eprocurement[J]. Galaxy, 2000, (9) :4 -6.