三峡工程电站尾水管顶板整浇方案温度应力研究 被引量:1

Study on Thermal Stress of Monolithic Pouring Scheme for Draft Tube Roof of TGP's Power Plant
下载PDF
导出
摘要 为了降低三峡电站厂房尾水管施工中出现的温度应力,原设计推荐采用传统的设置“封闭块”方案;但该方案施工进度慢。本文介绍了设置和取消“封闭块”两种工况的应力仿真计算结果,提出了取消“封闭块”,实施整浇顶板的建议。 For reducing the thermal stress in monolithically poured draft tube roof of TGP's power plant emerging in construction, a conventional “confined block” scheme was recommended in the original design, but the construction progress of this scheme is rather slow. The results of two simulated calculation with and without “confined block” are represented in the paper. A suggestion of implementing monolithical pouring without “confined block” is proposed.
出处 《长江科学院院报》 EI CSCD 北大核心 1999年第4期28-30,34,共4页 Journal of Changjiang River Scientific Research Institute
关键词 尾水管 整浇顶板 封闭块 混凝土 水电站 厂房 draft tube integral casting roof confined block thermal stress simulation calculation
  • 相关文献

参考文献2

  • 1朱伯芳,有限单元法原理与应用,1979年
  • 2朱伯芳,水工混凝土结构的温度应力与温度控制,1976年

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部