大江截流及二期围堰实施阶段投资控制 被引量:3

Investment Control over Phase-Ⅱ Cofferdams and River Closure
下载PDF
导出
摘要 三峡工程大江截流及二期围堰工程是三峡工程网络计划关键线路上的项目,施工难度大,建设标准高,牵涉面广,料源分散,施工强度高,工期紧,水下、地下工程量大,不可预见因素较多,使得工程投资控制难度较大。建设过程中采取有效措施,保证了工程建设质量、进度,工程投资得到了有效控制。合同总投资额53787.21万元,实际投资额57929.43万元,投资额增量7.7%。 As an item on the critical path of TGP network plan, the construction of the second -phase cofferdams and river closure dealt with such extreme difficulies, high construction standards, high construction intensity, tense schedule, scattered resources of materials, huge surface and underwater quantities and many uncertain factors that it was extremely dlfficult to control over the investment of the works. During construction the effective measures were taken to ensure controlling well over the construction quality, time schedule and investment.The total investment amount stipulated in contract documents was RMB 537. 8721 M, and the actual investment amount was 579.2943 M with an increment of 7. 7 %.
出处 《中国三峡建设》 1999年第7期33-35,46,共3页 China Three Gorges Construction
关键词 大江截流 二期围堰 项目 合同 投资 控制 Blocking of main course Phase-Ⅱ cofferdam Item Contract Execution Investment control
  • 相关文献

同被引文献1

  • 1全国监理工程师培训教材编写委员会,全国监理工程师培训教材审定委员会.工程建设投资控制[M]中国建筑工业出版社,1997.

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部