摘要
根据该厂的排污情况、治理现状及存在问题,本着充分利用原有设备和场地,设计了一套科学合理、经济适用的治理改造方案,方案实施后,经权威部门检测,各项出水水质指标符合国家标准,其设计新颖、布局紧凑、工艺先进,达到国内先进水平。
On the base of sewage, disposal and problem that need be solved, a scientific andreasonable economic plan is worked out, which fixed equipments and conditions can be fully madeuse of . The authority checkings show that recovered water reach the standard quota made by thegovernment. The improved plan is characterized by creative design, reasonable arrangement advanced technics which reach advanced level at home.
出处
《河南城建高等专科学校学报》
1999年第3期26-29,共4页
Journal of Henan Urban Construction Junior College
关键词
废水治理
工艺流程
逆流串联漂洗
仪表工业
sewage disposal
technics program
countercurrent fulling in series