期刊文献+

深凹露天转地下采场地压及位移监测研究 被引量:4

Study on monitoring of ground pressure and displacement in underground mining area below a mined open-pit
下载PDF
导出
摘要 杏山铁矿开采,处于露天转地下的过渡性阶段。为了解开采过程中采场地压及巷道变形规律,在-33m水平4、5回采进路中,布置8个钻孔应力计和4个收敛计对巷道围岩进行监测,并对监测结果进行分析,以确定采场围岩体中应力大小及巷道变形情况,更好地预测深部开采围岩地压活动规律,对矿山安全生产具有重要指导意义。 Mining operation in Xingshan iron is just in the transient stage from the open-pit mining to underground mining. In order to understand mining ground pressure and drift deformation in the mine , 8 borehole stress meters and 4 convergence gauges are arranged in No. 4 and No. 5 mining entrance o:[-33m level. According to the monitoring results, the mining ground pressure in surrounding rock mass and de- formation situation of drift are determined to improve prediction of ground pressure law in the mining area. This is of great significance for safety of the mining production.
出处 《中国矿业》 北大核心 2011年第4期67-70,77,共5页 China Mining Magazine
基金 国家“十一五”科技计划资助项目(2006BAB02A17)
关键词 监测 采场地压 巷道变形 围岩稳定性 monitoring ground pressure drift deformation stability of surrounding rock
  • 相关文献

参考文献3

二级参考文献9

共引文献39

同被引文献60

引证文献4

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部