上海华美达广场转换大梁施工中利用废旧钢格构柱拼装成桁架和闲置的塔吊标准节作模板支撑体系,并解决了在钢筋密集情况下混凝土的浇筑问题。
Waste steel lattice columns have been effectively applied to fabricate trusses and unused standard parts of the tower crane are used as the form supporting system during construction of transfer beams in Huameida Plaza Building of Shanghai.The problem of concrete pouring has been solved in the case of concentrated steel bars.
出处
《施工技术》
CAS
北大核心
1999年第8期25-26,共2页
Construction Technology
关键词
高层建筑
转换大梁
模板
模板支撑
混凝土浇筑
High rise building
Transfer beam
Form panel
Form supporting