摘要
针对核电站核岛工程中各建筑物平面布置紧凑、现浇混凝土量大、工期紧等特点,提出核岛建造期间施工塔吊动态平面布置、塔吊基础设计及附着装置的安装方法。
This paper presents dynamic plane arrangement, tower crane foundation design and installation methods of adhesive devices during nuclear power station construction according to the characteristics of compact plane arrangement, a great amount of cast concrete and short construction period in the nuclear power station project.
出处
《施工技术》
CAS
北大核心
1999年第8期47-48,共2页
Construction Technology
关键词
核电站
塔式起重机
动态平面布置
基础
附着装置
Nuclear power station
Tower crane
Dynamic plane arrangement
Tower crane foundation
Adhesive device