摘要
我国碾压混凝土坝经过30多年的技术改进,无论在规模、速度和质量上,碾压混凝土坝都达到了世界先进水平。本文结合我国水利工程建设现状和相关研究成果,对碾压混凝土坝在选材、设计、施工方面的关键问题进行了归纳,对碾压混凝土坝领域的最新研究进展及今后研究的主要方向进行了总结和展望。
After 30 years of technological improvements,China's roller compacted concrete dam has reached world advanced level in terms of size,speed and quality.In this paper,combining with the current situation of China's water conservancy projects and related research results,the author concludes the key issues upon the material selection,design,and construction of roller compacted concrete dam,and summarizes the latest research progress,and forecasts the future research directions of roller compacted concrete dam.
出处
《中国水能及电气化》
2011年第4期48-52,共5页
China Water Power & Electrification
关键词
碾压混凝土坝
配合比
防渗设计
斜层铺筑法
roller compacted concrete dam
mix proportion
seepage prevention design
inclined layer pavement method