8Endley L G. Towards the Development of a Complete Multiproject Scheduling System[J]. Journal of Industrial Engineering (S0022- 183X) ,1968,19(10) :505-515.
9EsakovJ, WeissT. Data Structures: An Advanced Approach Using C. Prentice-Hall, Inc, 1989.
2TURNER J R. The handbook of project-Based management [M]. London: McGraw-Hill, 1993.
3KURTULUS I, DAVIS E W. Multi-project scheduling:Categorization of heuristic rules performance[J]. Management Science, 1982, 28(2): 161 - 172.
4TSAI D M, CHIU H N. Two heuristics for scheduling multiple projects with resource constraints [J]. Construction Management and Economics, 1996, 14:325 -340.
5SPRECHER A, KOLISCH R, DREXL A. Semi-active,active, and non-delay schedules for the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 1995, 80: 94 - 102.
6LI K Y, WILLIS R J. An iterative scheduling technique for resource-constrained project scheduling[J]. European Journal of Operational Research, 1992, 56: 370-379.
7OZDAMAR L, ULUSOY G. A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis [J]. European Journal of Operational Research, 1996, 89: 400- 407.
8TORMOS P,LOVA A. An efficient multi-pass heuristic for project scheduling with constrained resources[J].International Journal of Production Research, 2003, 41(5):1071-1086.
9Joel P. Stinson, Edward W. Davis and Bsheer M. Khumawala, Multiple Resource-Constrained Scheduling Using Branch and Bound, ALLE Transaction, 10, 252-259, 1987.
10N.Christofides,R.Alvarez-valdes,J.M.Tamarit, Project scheduling with resource constraints: A branch and bound approach,European Journal of Operational Research, 29, 262-273, 1987.